SSAC-SYMCOM KRDR421A4 Time Delay Relay
Image Disclaimers Message
SSAC-SYMCOM KRDR421A4 Time Delay Relay
SSAC-SYMCOM KRDR421A4 Time Delay Relay
Part #:KRDR421A4
SKU #: 2229118
Key Features
Part #:KRDR421A4
SKU #: 2229118
Brand: Littelfuse
Contact Form: SPDT/NO-NC (1 Form C)
Dimensions: 2 in H x 2 in W x 1.21 in D
Electrical Connections: Male Quick-Connect Terminal
Operation Mode: On/Off
Series: KRDR
- Compact design and independent adjustment of on and off times provide greater flexibility for OEM applications and reduces component and labor costs
- Microcontroller based repeat accuracy +/-0.1% or 20 ms, whichever is greater, setting accuracy +/-2% or 50 ms, whichever is greater
- Isolated, 10 A, SPDT output contacts allows control of loads for AC or DC voltages
- Encapsulated, protects against shock, vibration and humidity
- On time first time delay
SSAC-SYMCOM KRDR421A4 Time Delay Relay
Littelfuse SSAC Time Delay Relay, Adjustable Recycling, Series: KRDR, Operation Mode: On/Off, 120 VAC, SPDT/NO-NC (1 Form C) Contact Form, 1 to 100 s, 1 to 100 min Time Setting, Male Quick-Connect Terminal Electrical Connections, -20 to 60 deg F, Surface Mounting, 2 in H x 2 in W x 1.21 in D Dimensions
Additional Description: LTFS-KRDR421A4 TIMER-RECYCLE 120VAC RLY ADJ 1-100S ON 1-100M OFF
Catalog Description: The KRDR Series is a compact time-delay relay measuring only 2 in. (50.8 mm) square. Its solid-state timing circuit provides excellent repeat accuracy and stability. Encapsulation protects against shock, vibration, and humidity. The KRDR Series is a cost effective recycling timer for OEM applications that require small size, isolation, reliability, and long life. Operation (Recycling - ON Time First): Upon application of input voltage, the output relay energizes and the T2 ON time begins. At the end of the ON time, the output de-energizes and the T1 OFF time begins. At the end of the OFF time, the output relay energizes and the cycle repeats as long as input voltage is applied. Reset: Removing input voltage resets the output and the time delays, and returns the sequence to the ON time. Operation (Recycling - OFF Time First): Upon application of input voltage, the T1 OFF time begins. At the end of the OFF time, the T2 ON time begins and the load energizes. At the end of the ON time the